What this calculator includes

  • Composite decking boards (with a 10% waste allowance)
  • Pressure-treated lumber for joists, beams and rim
  • Concrete mix for footings and post bases
  • Joist hangers and structural fasteners

What it does not include

  • Labor — or the permit and inspection fees your jurisdiction may require
  • Railing systems (code-dependent) and stairs beyond the basic deck frame
  • Footings deeper than the typical depth, or site work and grading