Paver joints
- Ratio
- Per the bag’s coverage
- Water
- Mist twice, 10–20 min apart
- Mixing
- None
- Working time
- Same dry day
- Cure
- 24 h no traffic
Pavers and joints dry; fill full, sweep the surface completely clean.
Mixing guides
Polymeric sand is not a mix: it is bagged joint sand with a binder that activates with water. Most failures are too much water, joints too shallow, or rain too soon.
The bag or tube wins
By job
Pavers and joints dry; fill full, sweep the surface completely clean.
Temperature
50–90°F (10–32°C)
Rain
No rain for 24 hours. Cover the field if rain threatens.
Watch for
Sand washes out
Likely cause: Too much water, or rain before the binder set.
Fix: Mist lightly, cover from rain, and top up after the cure.
A crust forms on top
Likely cause: Over-watering left a film on the pavers.
Fix: Break the crust, clean the surface and re-sand the joints.
Weeds or puddles at the joints
Likely cause: Joints too shallow, or the base drains poorly.
Fix: Top up the joint depth and fix the base drainage — sand cannot compensate.