Post hole / footing
- Ratio
- 1 × 80 lb bag
- Water
- 2.5–3 qt (2.4–2.8 L)
- Mixing
- 3–5 min
- Working time
- 20–30 min
- Cure
- 24–48 h before load
Crown the top away from the post; set the post base while the concrete is wet.
Mixing guides
Bagged concrete is already blended — cement, sand and gravel. You add water, not ingredients. The bag's water line wins over this page; everything here is the process around it.
The bag or tube wins
By job
Crown the top away from the post; set the post base while the concrete is wet.
One continuous pour; wire mesh sits mid-depth, not on the ground.
Dampen the old concrete; do not feather the patch to zero thickness.
Temperature
40–80°F (5–27°C)
Rain
Do not place in standing water or on frozen ground. Cover the work if rain is due within 24 hours.
Watch for
Crumbly, dusty surface
Likely cause: Too much water, or it dried in sun and wind before curing.
Fix: Mix stiffer; keep the work damp and shaded for 3 days.
Cracks across the slab
Likely cause: Too much water, no control joint, or rapid drying.
Fix: Use the bag ratio, add the designed control joint, and cure damp.
Base or post moves after setting
Likely cause: Soupy mix, or the hardware was not braced while wet.
Fix: Mix thick, set the base immediately and check plumb before it sets.